Distinguish stockouts from zero demand
Zero sales can mean no purchases despite availability, or no opportunity to buy because the item was unavailable. These situations require different treatment. Mark known stockout periods instead of teaching a forecast that every missing sale reflects weaker demand.
Do not replace constrained sales with an arbitrary average. Keep the agreed treatment and its reason visible so the planning team can explain changes to the demand estimate.
Measure lead time to usable availability
Measure from placing an order until goods are ready for use or sale. Approval, transport, receiving and quality checks may all contribute. Specify calendar or working days and use the same convention when matching demand to the lead time.
A weekly review process also needs to consider the wait until the next review. Check delivery variability: averages can conceal repeated late receipts.
A simplified illustration: 20 × 5 + 30 = 130
All numbers are fictional. Assume steady demand of 20 units per day, a five-calendar-day lead time and an arbitrarily chosen safety buffer of 30 units. Lead-time demand is 20 × 5 = 100 units; adding the buffer gives 130.
This illustrates a possible replenishment trigger under continuous review. It is not an optimized inventory formula: the buffer was not derived from a service level or variability. A trigger of 130 does not mean ordering 130 units.
Reconcile usable stock and open purchase orders
Separate blocked and reserved goods from physical on-hand stock. Check the remaining quantity and confirmed receipt date of every open purchase order. An incoming delivery cannot cover a shortage that occurs before it arrives. Adding all orders to today's stock hides this timing problem.
- Build a dated balance of requirements and usable receipts.
- Count commitments once; do not subtract the same reservation from both demand and stock.
- Check minimum quantities, pack sizes, shelf life and budget before purchasing.
Review the decision and its outcome
Record the calculation date and purchasing approver. After receipt, compare promised and actual lead times, shortages and surplus. Use this evidence to revise assumptions rather than increasing the buffer after every exception.
Read the demand forecasting overview and prepare a sample using the ERP data checklist. Discuss the scenario in an AMP demo; implementation scope is agreed through AMP services.
Frequently asked questions
Is 130 the order quantity?+
No. It is an illustrative trigger. Order quantity depends on the dated balance and agreed constraints.
Can zero sales be treated as zero demand?+
Only after checking availability and data completeness. Identify known stockouts separately.
Does AMP automatically place these orders?+
This guide makes no automatic ordering claim. It explains planning concepts; the actual purchasing workflow requires separate agreement.